Skip to content

A technical, systemic and integrated work methodology

BIMetral works with the model as a basis of information capable of evolving and adapting according to the different stages, uses and requirements of the asset throughout its life cycle. 

Open standards as a basis for work

BIMetral's practice is based on OpenBIM standards and interoperability, with a systemic vision that integrates architecture, building technology and environmental criteria within the same operational framework.

The use of open formats guarantees information traceability, compatibility between platforms, and the technological independence of the project throughout all its phases.

Our strategic pillars

BIM as a lifecycle framework

BIM acts as a tool for structuring and technically controlling the asset throughout its life cycle, using the model as an information base capable of evolving and adapting according to the different stages, uses and requirements of the asset beyond the geometric representation.

Sustainability as a structuring criterion

Sustainability is incorporated as a decision variable from early stages, integrating criteria of energy efficiency, environmental impact and life cycle analysis in accordance with the European context of energy transition and climate adaptation.

Who we work with

BIMetral works with architecture studios, engineering firms and organizations that need to integrate BIM into technical coordination processes, rehabilitation, digitization of existing assets and project information management.

Architectural studios

BIM integration in project phases, interdisciplinary coordination and technical control of the model.

Engineering and consulting firms

Coordination of disciplines, detection of interferences and regulatory verification in collaborative environments.

Promoters and asset managers

Digitization of existing assets, rehabilitation and structured management of building information.

Do you have a project that requires BIM integration?

Each project is analyzed according to its scope, level of detail, and applicable regulatory framework. Collaborations can be carried out on a case-by-case basis or integrated into multidisciplinary teams, depending on the complexity and needs of the project.